In this article
- Read the evaluation model first
- Mandatory and desirable requirements
- The question period is your best tool
- Qualification: what filters first
- Staffing and competence
- The price appendix
- After the bid
- Direct award and dynamic purchasing systems
- Common reasons for rejection
- How we do it in Portway
- Sources
- Frequently asked questions
Short answer: Public procurements of occupational health are seldom decided by how good you are and often by whether the bid is formally complete. A mandatory requirement answered with a reservation leads to rejection whatever the rest says, and the final bid date is absolute. Spend your time in this order: read the evaluation model first and work out where the points actually are, ask your questions before the question period closes, and answer what is asked instead of what you usually tell. Fill in the price appendix last and check the sums twice.
This article describes the flow from the provider's side. How client companies choose in the private, less formal process we go through separately in how clients choose providers.
Read the evaluation model first
The most common mistake is to start in the description of your own business. Start instead at the back: how the bids are scored.
The models that occur:
- Lowest price. Quality is then fully regulated in the mandatory requirements, and all that remains is to meet them most cheaply. Either you can or you cannot. Do not spend weeks on descriptive text that is not scored.
- Best price-quality ratio. Here there are desirable requirements that give points. Work out what each point is worth in kronor before you write: sometimes a quality criterion is worth more than a ten percent price cut, sometimes the reverse.
- Fixed price or fixed quality. Less common, but it occurs.
When you know where the points are, you also know where the text should go. A bid that is detailed where nothing is scored and brief where it is loses to a worse company that read the model.
Mandatory and desirable requirements
The difference is absolute and worth being pedantic about.
Mandatory requirements must be met in full. An answer with a reservation ("we can offer this from the third quarter") is a no, and the bid is rejected. If you cannot meet a mandatory requirement, the decision is to abstain, not to write around it.
Desirable requirements give points. Here it is worth describing what you actually do, with concrete details instead of adjectives.
What helps most in practice: go through the requirement list row by row and mark yes or no before you write anything at all. If a no shows up on a mandatory requirement, you have saved a week.
The question period is your best tool
During the tender period there is a window in which you can put questions to the contracting authority. It is heavily underused.
Two things to know:
- Answers go to all bidders, anonymized. You reveal your question to the competitors, but you also get theirs.
- An unclear or unreasonable requirement can be adjusted if someone points it out. A mandatory requirement that only the current provider can meet is worth asking about; sometimes it is rewritten.
Questions after the last question date are normally not answered. Set a reminder for that date, not only for the final bid date.
Qualification: what filters first
Before anyone reads your descriptions, it is checked that you may take part. Grounds for exclusion concern, among other things, unpaid taxes and charges and certain offences, and they are set out in chapter 13 of the Public Procurement Act (LOU) (in Swedish). In addition there are requirements on financial standing and technical ability.
Above the thresholds the ESPD, the European Single Procurement Document, is normally used as a self-declaration: you certify that the requirements are met, and the evidence is requested from the one who is to be awarded. Below the thresholds it varies.
Two things trip up smaller providers:
- Turnover requirements. Sometimes a certain annual turnover is required. If you cannot reach it yourself, you can rely on another company's capacity, but then a commitment from them has to be attached to the bid.
- Reference assignments. Almost always one or more comparable assignments are required, often with a contact person. You cannot fix this during the tender period. Ask your existing customers whether they will act as references before you need them, and check that the contact details are right: a reference who does not answer when the authority calls sometimes does not count.
Staffing and competence
In occupational health, the competence requirements are what make the procurement special. Typically access is required to an occupational physician, occupational nurse, behavioral scientist, ergonomist and work environment engineer, often with stated education and a number of years of experience.
What to check before you spend time:
- Is employed staff required, or are subcontractors and consultants accepted? The difference decides whether you can bid at all.
- Are named people to be given with CVs? Then you need their consent, and you tie yourself to them for the contract term.
- What applies if a key person is replaced during the contract? The condition is often in the draft contract and seldom read until it matters.
- Is there a requirement for geographic proximity: a clinic within a certain distance, or visits on site at the customer?
The price appendix
The price is submitted in a fixed template, and it is to be filled in as it is. Your own rows, changed formulas or deleted tabs are a common reason for rejection.
Worth checking:
- What is multiplied by what? The evaluation often uses fictitious volumes that do not match the real distribution. A low hourly rate on a line with a high fictitious volume can win the procurement and then be unprofitable in operation, so calculate both.
- What is included in the price? Travel time, missed appointments, certificates and documentation are items that are either priced or assumed to be included. If they are assumed included, they have to be calculated in.
- Fixed prices during the term. A four-year contract without an index clause is a four-year price risk. If it is in the draft contract, calculate on it.
Check the sums by hand once, outside the template. Formula errors in a price appendix are otherwise discovered by the evaluator.
After the bid
When the evaluation is done, an award decision is sent to all bidders. After that a standstill period runs, ten days if the decision is sent electronically and otherwise fifteen days (Upphandlingsmyndigheten, in Swedish, retrieved 20 October 2026), during which the contract may not be signed and a provider who thinks something went wrong can apply for review in the administrative court.
In practice: request the evaluation record and the scoring of the winning bids, whatever the outcome. The documents are normally public once the award is made, except what is covered by confidentiality. It is the cheapest market analysis you can do, and it says more about the next procurement than any sales training.
Review is a blunt instrument. It is justified for an actual error in the procedure, but an application that mostly expresses dissatisfaction costs time and relationship without changing anything.
Direct award and dynamic purchasing systems
Not everything is a full-scale procurement. Under the direct award threshold the authority may buy without advertising, which in practice means that a relationship and a fast answer decide. The threshold values are adjusted from time to time: check the current amount with the Swedish Agency for Public Procurement instead of trusting a figure you remember.
More and more authorities also use dynamic purchasing systems or framework agreements with renewed competition. There the big qualification is a one-off effort, and after it come call-offs with short response times. Getting into such a system is often worth more than winning a single procurement.
Common reasons for rejection
- The final bid date missed. Absolute, without exception.
- A mandatory requirement answered with a reservation or left unanswered.
- The price appendix changed or incomplete.
- A requested appendix missing: certificate, CV, reference form.
- An answer that describes something other than what the question asks.
None of them is about the quality of your service, and all can be avoided with a read-through by someone who did not write the bid.
How we do it in Portway
What is usually hardest to show in a bid meeting is how the client actually works in the portal. In Portway each client company has its own catalogue of the services the agreement covers, and the portal can carry your logo and accent colour. Login is a one-time link by e-mail, which suits people who log in rarely. The client's administrator sees all departments, while a department administrator sees their own. That lets you show a client's view instead of describing it.
Questions about personal data processing are now asked in most tenders. Portway's database, files and server are in the EU, at Railway in the Netherlands, and the sub-processors are listed in our privacy policy. We go through the questions in GDPR and security.
If you want to see what a bid demo can look like with your own services, you can book a walkthrough.
Sources
- Public Procurement Act (2016:1145) (in Swedish). Retrieved 20 October 2026.
- Upphandlingsmyndigheten, Avtalsspärr och ingå avtal (in Swedish). Retrieved 20 October 2026.
Frequently asked questions
How long is the tender period normally?
Above the thresholds there are statutory minimum times, and in practice the tender period is often four to six weeks. Count backwards from the last question date, not from the final bid date: it is the question period that decides when you must be through the requirement list.
Can we bid as a small provider?
Yes, if you pass qualification. What most often stands in the way is turnover requirements and reference assignments, and both can be solved: turnover by relying on another's capacity with a written commitment, references by asking existing customers in good time.
What happens if we win but cannot staff it?
The contract applies. The staffing requirements in the tender documents are commitments, and failing to meet them is a breach of contract with penalties or termination as the result. Do not bid on volumes you cannot deliver.
Do we get to know why we lost?
The award decision must contain the reasons, and the evaluation record with the scoring is normally public. Request it even when you won: it shows how close the competitors were.
Is it worth applying for review?
Only for a concrete error in the procedure, for example a requirement that was not followed or an evaluation that departed from the announced model. Review prolongs the process for everyone and is decided on formal grounds, not on who had the best offer.